- Joined
- Dec 24, 2002
- Messages
- 12,637
- Reaction score
- 168
- Points
- 63
- Location
- Los Angeles, California
- Your Mac's Specs
- 14in MacBook Pro M1 Max 32GB 2TB
Will, I have a long list of honey dos. Since it is the memorial week-end, I thought I would try make a dent in my list.
I started working on tiling and painting the guest bathroom. I have completely gutted the bathroom, except for the toilet, which will come out in the morning. The most laborous part, was the removal of the sheet of linoleum, very hard on the back.
The next step is to remove the remaining paper backing and glue, from the floor. Hopefully tomorrow the ceramic floor tile will go in, with no problems. I have layed out the floor, so I have a plan.
But after starting the project, I looked at my honey do list, and it is still quite long.
I started working on tiling and painting the guest bathroom. I have completely gutted the bathroom, except for the toilet, which will come out in the morning. The most laborous part, was the removal of the sheet of linoleum, very hard on the back.
The next step is to remove the remaining paper backing and glue, from the floor. Hopefully tomorrow the ceramic floor tile will go in, with no problems. I have layed out the floor, so I have a plan.
But after starting the project, I looked at my honey do list, and it is still quite long.